Entry point is "Peliyagoda" is near to New Kelani bridge and 6 lanes are available between New Kelani bridge and Peliyagoda. 4 lanes are available between Peliyagoda and katunayake. Expected travel time is around 20 minutes. It is expected to connect to the proposed "Outer Circular Highway" at Kerawalapitiya.
The entire extent of the expressway is covered by CCTV cameras and 54 large screens at the central operation room at Seeduwa help authorities monitor the expressway on 24 hours.
The expressway is passing through the open land of "Muthurajawela" marshes and the lagoon of Negambo by giving a natural beauty. Special attention was paid during the construction to preserve the natural environment as the expressway winds its way through the Muthurajawela marshes and the Negombo lagoon.
It has opened from 22nd October to 24th October 2013 for Public viewing.
at Public viewing |
The expressway was public on 27th October by his Excellency the President Hon. Mahinda Rajapakse.
The Opening Ceremony |